A27 Stockbridge Road Footbridge

Client:
Highways England
Main Contractor:
R&W Civil Engineering
Date:
August 2017 – August 2018
Contract Value:
£535k

Scope of works:

Following a vehicle strike, Four-Tees Engineers were engaged to assist with the removal of the existing damaged footbridge span. Four-Tees Engineers then detailed, fabricated, painted, and installed a new main and side spans onto the existing columns and abutments during a night-time closure of the A27 dual carriageway.
Providing our clients with a safe, professional and reliable service
© Four Tees Engineers Ltd 2020 | Registered in England No. 2002609, Registered office: 1 Dewar Close, Segensworth West, Fareham, Hampshire PO15 5UB
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram