Berth 34/35 Fenders - ABP Southampton

Client:
ABP
Main Contractor:
Knights Brown (Raymond Brown)
Date:
2017
Contract Value:
£600k

Scope of works:

Detailing, fabrication, and installation of seven 26 tonne steel fender panels to support the fitting of large pneumatic fenders for berthing of roll on – roll off vessels. Access to the works was provided by suspended scaffold platforms, cantilevered over the quayside. To minimise on-site work, the fender panels were fabricated off-site and delivered in two halves for welding together before the completed, 26 tonne units were transported to berths 34-35. Loading restrictions at the berth required a 200t crane to be sited 15m back from the edge of the quay.
Providing our clients with a safe, professional and reliable service
© Four Tees Engineers Ltd 2020 | Registered in England No. 2002609, Registered office: 1 Dewar Close, Segensworth West, Fareham, Hampshire PO15 5UB
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram