Castle Way Footbridge - Southampton

Client:
Southampton City Council (Balfour Beatty)
Main Contractor:
R&W Civil Engineering
Date:
September 2018
Contract Value:
£63k

Scope of works:

Four-Tees Engineers lifted the existing footbridge off its abutments and took it to an off-site facility to repair, refurbish and repaint the structure before returning it to site to lift it onto its original position. This off-site repair greatly reduced disruption to the public at this popular shopping location.
Providing our clients with a safe, professional and reliable service
© Four Tees Engineers Ltd 2020 | Registered in England No. 2002609, Registered office: 1 Dewar Close, Segensworth West, Fareham, Hampshire PO15 5UB
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram