Luton Dart Parapet to Gateway Bridge

Client:
Luton Airport (LBC)
Main Contractor:
Volker Kier JV
Date:
August 2018 – June 2020
Contract Value:
£397k

Scope of works:

FTE detailed, fabricated and installed a stainless-steel parapet system to the viaduct and Gateway bridge structures at the western end of the new Luton Dart mass rapid transit system. The transport system connects the expanding Luton airport to the Luton airport parkway train station.
Providing our clients with a safe, professional and reliable service
© Four Tees Engineers Ltd 2020 | Registered in England No. 2002609, Registered office: 1 Dewar Close, Segensworth West, Fareham, Hampshire PO15 5UB
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram