Detailing, fabrication and installation of a 43m span bridleway bridge over the M27 SMART motorway between junctions 9 and 10 near Fareham in Hampshire. The bridge and side spans were constructed in sections before being painted and then assembled on site. The finished structure was installed during a full motorway closure.
Providing our clients with a safe, professional and reliable service