Portsmouth Ferryport Dolphin

Client:
Portsmouth International Port
Main Contractor:
Bam Nuttall
Date:
2009
Contract Value:
£210k

Scope of works:

Working for BAM Nuttall, Four-Tees Engineers detailed, fabricated, and assisted with the install of a 70 tonne single piece Dolphin unit at Portsmouth Ferry Port. The Dolphin was fabricated off site in one piece before being transported by barge and lifted into place. The off-site fabrication greatly reduced disruption in the port and helped our client reduce time on site.