River Arun – Bridge Strengthening Works

Client:
Network Rail
Main Contractor:
BAM Nuttall
Date:
October 2015 – September 2016
Contract Value:
£1.1m

Scope of works:

Detailing, fabrication, and installation of steelwork strengthening scheme to the railway bridge over the Arun river at Pulborough. In addition to the strengthening of the main girders we replaced the cross girders and introduced rail bearers and redocked the structure. The existing life expired timber decking was replaced with a GRP system that will give years of maintenance free service.
No ACF gallery field data found
Providing our clients with a safe, professional and reliable service
© Four Tees Engineers Ltd 2020 | Registered in England No. 2002609, Registered office: 1 Dewar Close, Segensworth West, Fareham, Hampshire PO15 5UB
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram