Detailing, fabrication, and installation of steelwork strengthening scheme to the railway bridge over the Arun river at Pulborough. In addition to the strengthening of the main girders we replaced the cross girders and introduced rail bearers and redocked the structure. The existing life expired timber decking was replaced with a GRP system that will give years of maintenance free service.
No ACF gallery field data found
Providing our clients with a safe, professional and reliable service