Underbridge Strengthening for Network Rail

Client:
Network Rail
Main Contractor:
Dyer & Butler
Date:
2019 - 2020
Contract Value:
£539k

Scope of works:

We were engaged to survey, detail, fabricate and install bridge strengthening schemes to three rail bridge structures in the Wessex route. Works involved the introduction of a “top hat” to the existing beams to increase the effective depth of the beams to increase their capacity and strengthen the structures.
Providing our clients with a safe, professional and reliable service
© Four Tees Engineers Ltd 2020 | Registered in England No. 2002609, Registered office: 1 Dewar Close, Segensworth West, Fareham, Hampshire PO15 5UB
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram