Following a vehicle strike, Four-Tees Engineers were engaged to assist with the removal of the existing damaged footbridge span. Four-Tees Engineers then detailed, fabricated, painted, and installed a new main and side spans onto the existing columns and abutments during a night-time closure of the A27 dual carriageway.