Projects

The FTE Intelligent Integration approach can be readily deployed across all markets sectors with a demand for a structural steel specialist.
Better project management means faster, more reliable manufacturing and installation, delivered though a proven design and production process.

Reduce the interfaces, reduce the variations, reduce time from scoping to delivery with a streamlined project management process.
Low embodied carbon steel and renewable energy fabrication provides a faster route to more sustainable production.

Chelmer Waterside AGI Platform Replacement

Brighton Road – Bridge Collision Beams

Intelligent In-house Design Solutions

Hengrove Bus Depot Electrification

Eastleigh Long Rail Depot

Borough Market Bridge

Lymington Viaduct Strengthening

Brading Station Footbridge

Lifeboat Stations

Northstowe Footbridges

Blechynden Footbridge

Research Project – Fatigue in metallic rail bridges

ANS Structures

M27 North Fareham Footbridge

Nuneham Viaduct

RNLI Lizard Lifeboat Station

RNLI – Padstow Lifeboat Station

Chichester Water Treatment Works

Peacehaven Pumping Station

Portsmouth Ferryport Dolphin

RNLI Bembridge Lifeboat Station

Renewal of Lock Gates – Shoreham Harbour

Jacobs Ladder Footbridge (Blackfriars, Portsmouth)

The Wash Tidal Gauge – Humberside

Harwich International Port

Bridge Road – Woolston

RNLI St. David’s Lifeboat Station

River Arun – Bridge Strengthening Works

Milford on Sea – Coastal path repairs

A27 Falmer Bridge – Brighton