A27 Stockbridge Road Footbridge

Contract Value: £535k

Client:

Highways England

Main Contractor:

R&W Civil Engineering

Scope of works:

Following a vehicle strike, Four-Tees Engineers were engaged to assist with the removal of the existing damaged footbridge span. Four-Tees Engineers then detailed, fabricated, painted, and installed a new main and side spans onto the existing columns and abutments during a night-time closure of the A27 dual carriageway.