Four-Tees Engineers surveyed, detailed, fabricated, and undertook on site repairs to the structure for the main contractor Dyer & Butler. The repairs had been identified and specified by the PC’s designer. The multi coloured paint scheme was proposed by the PC as the bridge is used by local school children from 7 different schools. Hand-prints were taken from children representing the various schools and these were enlarged and painted onto the coloured panels.