Luton Dart Parapet to Gateway Bridge

Contract Value: £397k

Client:

Luton Airport (LBC)

Main Contractor:

Volker Kier JV

Scope of works:

FTE detailed, fabricated and installed a stainless-steel parapet system to the viaduct and Gateway bridge structures at the western end of the new Luton Dart mass rapid transit system. The transport system connects the expanding Luton airport to the Luton airport parkway train station.