River Arun – Bridge Strengthening Works

Contract Value: £1.1m

Client:

Network Rail

Main Contractor:

BAM Nuttall

Scope of works:

Detailing, fabrication, and installation of steelwork strengthening scheme to the railway bridge over the Arun river at Pulborough. In addition to the strengthening of the main girders we replaced the cross girders and introduced rail bearers and redecked the structure. The existing life expired timber decking was replaced with a GRP system that will give years of maintenance free service.