Rothera Wharf, Rothera Research Station – Antarctic

Contract Value: £2.8m

Client:

British Antarctic Survey

Main Contractor:

Bam Nuttall

Scope of works:

Four-Tees Engineers detailed and fabricated almost 1000t of steel components that were shipped to the Antarctic and assembled to form the new wharf structure for the Rothera research station. Once fabricated the components were trial assembled at a build site local to our offices to both ensure fit and to enable the build team to gain experience in a controlled environment.