Underbridge Strengthening for Network Rail

Contract Value: £539k

Client:

Network Rail

Main Contractor:

Dyer & Butler

Scope of works:

We were engaged to survey, detail, fabricate and install bridge strengthening schemes to three rail bridge structures in the Wessex route. Works involved the introduction of a “top hat” to the existing beams to increase the effective depth of the beams to increase their capacity and strengthen the structures.