Projects

The FTE Intelligent Integration approach can be readily deployed across all markets sectors with a demand for a structural steel specialist.
Better project management means faster, more reliable manufacturing and installation, delivered though a proven design and production process.

Reduce the interfaces, reduce the variations, reduce time from scoping to delivery with a streamlined project management process.
Low embodied carbon steel and renewable energy fabrication provides a faster route to more sustainable production.

Berth 34/35 Fenders – ABP Southampton

RNLI Poole Lifeboat Station

Rothera Wharf, Rothera Research Station – Antarctic

A27 Stockbridge Road Footbridge

Castle Way Footbridge – Southampton

Refurbishment of Lock Gates – Port of Sunderland

North End Footbridge

Cutters Bridge – Ely

Luton Dart Parapet to Gateway Bridge

Underbridge Strengthening for Network Rail

Victoria Station – London